31.83kw Refrigerating Capacity Reinforced Frame Water Cooling Chiller For Plastic Factory
Main Features
1. Equipped with imported compressor and high efficiency condenser and evaporator, excellent cooling capacity,
quiet and low electricity consumption.
2. 304S.S or 316 S.S tanks are equipped, easy to clean and maintain.
3. Use electronic thermostat to keep temperature within 3-5 ºC.
4. Installed with current overload protector, high and low pressure switch, electronic timer delay, fault display
system.
5. Have LCD Screen to display the outlet and inlet and temperatures setting of chill water.
6. Single or double or four compressors combination unit are available for your chillers to meet your refrigeration
requirement, have English and China human-machine interface.
Technical Parameters
Model No. |
RHP-10W |
Refrigeration Capacity |
31.83kw |
Temp. Control Range |
5ºC ~ 35ºC |
Power Supply |
380V-3Phase-50Hz |
Total Power Consumption |
9kw |
Refrigerant |
Type |
R407C/R134A |
Control |
Thermal Expansion Valve |
Compressor |
Brand |
Panasonic |
Type |
Hermetic Scroll Type |
Power |
3.8kw x 2 |
Condenser |
Type |
Dry Type Shell and Tube |
Cooling Water Flow |
7.1m3/h |
Inlet/Outlet Pipe |
Dia.1-1/2" |
Evaporator |
Type |
Tank Coils |
Chilled Water |
5.6m3/h |
Tank Volume |
200L |
Inlet/Outlet Pipe |
2" |
Water Pump |
Power |
1.5kw |
Max Lift |
25m |
Max Flow Rate |
13.5m3/h |
Controller |
PLC |
Protector Device |
Compressor overheating protection, over current protection, high and low pressure protection traffic protection, phase sequence/phase loss protection, low level protection, frost protection over temperature protection |
Size |
L1230 x W690 x H1390 mm |
Weight |
270kg |
Work Condition
1.Above cooling capacity is based on Chilled Water Inlet=12°C & Outlet=7°C;
2.Cooling Water: Inlet Temp.=30°C, Outlet Temp.=35°C;
Working Principle
Applications
Be widely used in plastics, electroplating, electronics manufacturing, pharmaceutical chemicals, food processing,
refrigeration and other industrial establishments and guesthouses, hotels, shopping malls, office buildings and
other types of civil air-conditioning system .
Package & Shipping
(1) Use standard export plywood case with forklift truck feet, easy to load and unload .
(2) 5-7 days to finish the production after receiving the deposit .
(3)Shipping by LCL or FCL .
After-sales service
(1) 12 months quality warranty since the date of delivery.
(2) Free of charge to replace new chillers if quality problems.
(3) Cost price to buy extra parts with Chillers from Ruihai if needed.
(4) 24 hours online service by e-mail, WhatsApp, Skype or Telephone Calling.
(5) Installation Video to help installation even send engineer to customer's jobsite .