Secured Trading Service

Export Quality Excellent Cooling Refrigeration Equipment for Manufacturing Plant

Ruihai Chiller Co., Ltd.
  • Audited Supplier
  • 12 yrs

Contact Supplier

Product Highlights

  • High Energy Efficiency: First energy utilization rate up to 90%, significantly reducing user consumption costs.
  • No Cooling Tower Required: Eliminates need for cooling water system, pumps, and pipes, saving construction investment.
  • Versatile Voltage Options: Supports 220V, 380V, and 415V at 50Hz/60Hz for global compatibility.
  • Customization Available: Custom-made options available for refrigerant types and power consumption.
  • Comprehensive Protection: Includes overload, phase loss, high/low pressure, and frost protection devices.
  • Compact Outdoor Design: Integral structure requires no separate refrigeration room, saving space.
  • Fast Delivery: Production completed within 5-7 days after deposit receipt.
  • Global Certifications: Certified with CE, RoHS, ISO, UR, and CCC standards.

Shipping

Shipping Cost:
Contact the supplier about freight and estimated delivery time.

Online Trading Protection

Payment Guarantee
T/T PayPal ApplePay GooglePay visa mastercard american express discover JCB diners club PIX SPEI OXXO PSE OZOW Platform-protected payments with refund support for eligible order issues.
Platform Logistics
Clearer shipment tracking with platform-supported logistics.
Inspection Service
Optional pre-shipment inspection for quality and quantity checks.
After-Sales & Dispute Handling
Platform-assisted dispute resolution, including refunds or returns when applicable.

Only orders placed and paid through Made-in-China.com Secured Trading are eligible for payment protection and the corresponding platform services.

Product Images of Export Quality Excellent Cooling Refrigeration Equipment for Manufacturing Plant

Export Quality Excellent Cooling Refrigeration Equipment for Manufacturing Plant
Export Quality Excellent Cooling Refrigeration Equipment for Manufacturing Plant pictures & photos
Export Quality Excellent Cooling Refrigeration Equipment for Manufacturing Plant
Export Quality Excellent Cooling Refrigeration Equipment for Manufacturing Plant pictures & photos
Export Quality Excellent Cooling Refrigeration Equipment for Manufacturing Plant
Export Quality Excellent Cooling Refrigeration Equipment for Manufacturing Plant pictures & photos
Export Quality Excellent Cooling Refrigeration Equipment for Manufacturing Plant
Export Quality Excellent Cooling Refrigeration Equipment for Manufacturing Plant pictures & photos
Export Quality Excellent Cooling Refrigeration Equipment for Manufacturing Plant
Export Quality Excellent Cooling Refrigeration Equipment for Manufacturing Plant pictures & photos
Export Quality Excellent Cooling Refrigeration Equipment for Manufacturing Plant
Export Quality Excellent Cooling Refrigeration Equipment for Manufacturing Plant pictures & photos
Export Quality Excellent Cooling Refrigeration Equipment for Manufacturing Plant
  • Export Quality Excellent Cooling Refrigeration Equipment for Manufacturing Plant
  • Export Quality Excellent Cooling Refrigeration Equipment for Manufacturing Plant
    Export Quality Excellent Cooling Refrigeration Equipment for Manufacturing Plant
  • Export Quality Excellent Cooling Refrigeration Equipment for Manufacturing Plant
    Export Quality Excellent Cooling Refrigeration Equipment for Manufacturing Plant
  • Export Quality Excellent Cooling Refrigeration Equipment for Manufacturing Plant
    Export Quality Excellent Cooling Refrigeration Equipment for Manufacturing Plant
  • Export Quality Excellent Cooling Refrigeration Equipment for Manufacturing Plant
    Export Quality Excellent Cooling Refrigeration Equipment for Manufacturing Plant
  • Export Quality Excellent Cooling Refrigeration Equipment for Manufacturing Plant
    Export Quality Excellent Cooling Refrigeration Equipment for Manufacturing Plant
  • Export Quality Excellent Cooling Refrigeration Equipment for Manufacturing Plant
    Export Quality Excellent Cooling Refrigeration Equipment for Manufacturing Plant

Find Similar Products

Product Description

Export Quality Excellent Cooling Refrigeration Equipment For Manufacturing Plant
 




 

Detailed Photos

Export Quality Excellent Cooling Refrigeration Equipment for Manufacturing Plant

Export Quality Excellent Cooling Refrigeration Equipment for Manufacturing Plant

Export Quality Excellent Cooling Refrigeration Equipment for Manufacturing Plant

Export Quality Excellent Cooling Refrigeration Equipment for Manufacturing Plant

Export Quality Excellent Cooling Refrigeration Equipment for Manufacturing Plant


 

Main Features

1. Suitable for the building with 200-10000m2.

2. Air conditioner system with cold and heat source unity, no boiler room needed, more suitable for simultaneous
   heating and cooling needs of users.

3. Install it outdoor, do not need refrigerator room, eliminating the need for refrigeration room, saving construction
    investment.

4. The first energy utilization rate is up to 90%, saving energy consumption, greatly reducing the cost of the user.

5. No cooling tower needed, at the same time, eliminating the need of water pump and pipe system, reducing the
    cost of extra equipment.

6. No cooling water system power consumption, no cooling water loss, more suitable for water shortage areas.




 

Technical Parameters
 
Model No. RHP-15A
Refrigeration Capacity 44.15kw
Temp. Control Range 5ºC~35ºC
Power Supply 380V-3Phase-50Hz
Total Power Consumption 13.7kw
Refrigerant Type R407C
Control Thermal Expansion Valve
Compressor Brand Panasonic
Type Hermetic Scroll
Power 5.6kw x 2
Condenser Type Efficient copper aluminum Fin & Low Noise Fan
Cooling Air Flow 15000m3/h
Fan Power 3.7kw x 2
Evaporator Type Tank Coils
Chilled Water 7.6m3/h
Tank Volume 210L
Inlet/Outlet Pipe Dia.2"
Water Pump Power 1.5kw
Max Flow Rate 25.2m3/h
Lift 21.5m
Controller PLC
Protector Device Compressor overheating protection, over current protection, high and low pressure protection traffic protection, phase sequence/phase loss protection, low level protection, frost protection over temperature protection
Size L1870 x W860 x H1955 mm
Weight 600kg


Work Condition
 
1.Above cooling capacity is based on Chilled Water Inlet=12°C & Outlet=7°C, Ambient Temp.=35°C .
2.Power Supplier Options: 220V-3Phase-50Hz/60Hz, 380V-3Phase-50Hz/60Hz, 415V-3Phase-50Hz/60Hz .
3.Refrigerant Options: R407C, R134a, R404a .


 
Structure Drawing

Export Quality Excellent Cooling Refrigeration Equipment for Manufacturing Plant



Main Components

Export Quality Excellent Cooling Refrigeration Equipment for Manufacturing Plant


 

Working Principle

Export Quality Excellent Cooling Refrigeration Equipment for Manufacturing Plant


 

Connection Diagram


Export Quality Excellent Cooling Refrigeration Equipment for Manufacturing Plant



Applications

Coating Systems - Chemical & Pharmaceutical Processes - Plastics Processing - Thermoform
Machines - Plasma Coating- Medical Imaging Systems - Food & Beverage Industry - Electroplating
Baths - Biogas & Natural Gas Treatment - Compressed Air Treatment - Extruders - Surface Processing
- Flexographic Printing Systems




 

Package and Shipping

(1) Use standard export plywood case with forklift truck feet, easy to load and unload .

(2) 5-7 days to finish the production after receiving the deposit .

(3) Shipping by LCL or FCL .



Export Quality Excellent Cooling Refrigeration Equipment for Manufacturing Plant

Export Quality Excellent Cooling Refrigeration Equipment for Manufacturing Plant

Why Choose Us ?

It's easy to cooperate with our company, you do not need to worry about anything.

1. CE approved, meet ISO 9001 standard.

2. Assembled package and only need to connect the pipes on jobsite.

3. Complete commissioning before delivery.

4. Low failure and low maintenance cost.

5. Custom-made is available.

6. Very fast delivery.

7. Have 7/24 after-service.

8. 24months quality warranty.



 

After-Sales Service

(1) 12 months quality warranty since the date of delivery.

(2) Cost price to buy extra parts with Chillers from Ruihai if needed.

(3) 7/24 online service by e-mail, WhatsApp, Skype or Telephone Calling.

(4) Installation Video to help installation even send engineer to customer's jobsite if needed . 





 


 
 

 

About the Supplier

This supplier has been audited by TÜV Rheinland. Verify the report on the official TÜV Rheinland website with ID "MIC-ASR222468". Items marked "verified" are certified.

Watch Video
Watch Video
Ruihai Chiller Co., Ltd.
Ruihai Chiller Co., Ltd.
Ruihai Chiller Co., Ltd.
Ruihai Chiller Co., Ltd.
Ruihai Chiller Co., Ltd.
Ruihai Chiller Co., Ltd.
Ruihai Chiller Co., Ltd.
Ruihai Chiller Co., Ltd.

About Our Factory & Business Background

Address
Room 1301, Longshengshidaidasha building , Longhua district, Shenzhen,China
Terms of Payment
LC, T/T, D/P, PayPal, Western Union, Small-amount payment, Money Gram
International Commercial Terms(Incoterms)
FOB, CFR, CIF, DAT, FAS, DDP, DAP, CIP, CPT, FCA, EXW, Others
Average Lead Time
Peak Season Lead Time: one month
Off Season Lead Time: within 15 workdays
Nearest Port
Yantian port of ShenZhen, Shekou port of ShenZhen

Our Production Capability & Technical Expertise

Main Products
Industrial Chillers, Water Cooled Chillers, Air Cooled Chillers, Screw Type Chillers, Small Chillers, Chiller, Low Temperature Chillers, Closed Cooling Tower, Water Chiller, FRP Cooling Tower

Our Industry Experience & Global Business Record

Export Year
2012-10-18
Main Markets
North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

FAQ

What is the warranty period?
We provide a 12-month quality warranty from the date of delivery, with an option for a 24-month quality warranty.
Can the voltage be customized?
Yes, power supply options include 220V, 380V, and 415V at 50Hz or 60Hz.
Is the refrigerant type customizable?
Yes, we offer options for R407C, R134a, and R404a refrigerants.
How long does production take?
Production is finished within 5-7 days after receiving the deposit.
What after-sales services are provided?
We offer 7/24 online service via email, WhatsApp, Skype, or phone, plus installation videos and engineer support if needed.
Does the unit require a cooling tower?
No, the unit is air-cooled and does not require a cooling tower, water pump, or pipe system.
What is the energy efficiency rate?
The first energy utilization rate is up to 90%, greatly reducing energy consumption.
What is the lead time during peak season?
The average lead time during peak season is one month.

Send your message to this supplier

Contact Information
Recipient
Message

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now